top of page
Get in touch for a FREE consultation
![]() | ![]() | ![]() | ![]() |
---|---|---|---|
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
![]() | ![]() |
CHALET WITH LIFT
ESSERT ROMAND, MORZINE
Start: June 2018
SIP build time: 6 days
Overview: Kingspan TEK 172mm SIPs, timber cladding, concrete basement with insulated render
Project type: Fully managed
Size: 265sqm - 3 storey
Overall Build Cost: €2600 HT per sqm
SIP Installation Cost: €114,465 HT
Eco: Underfloor heating, air sourced heat pump, heat exchanger, triple glazing


ENERGY EFFICIENCY
This chalet received one of the highest energy ratings in the area due to high levels of insulation, triple glazing and use of renewable energy.
Click each image above for more info, or locate our recent projects on the map and click the link to view
FASTER CONSTRUCTION - LOWER COSTS
Our experienced team erected this 265sqm chalet in just 6 days. Quicker on-site construction means cutting down on labour and the risk of costly delays.
CONSTRUCTION VIDEO DIARIES
bottom of page